Results 1 to 5 of 5

Thread: Evony Build / Production Worksheet V2.0

Threaded View

  1. #1

    Default Evony Build / Production Worksheet V2.1

    Hey Everyone,

    The original thread for this got archived so I am starting a new thread. The original can be found here: http://bbs.evony.com/showpost.php?p=575107&postcount=29

    I am posting version 2.0 of my build sheet / production calculator. The tool is an Excel spreadsheet and can be viewed with most spreadsheet tools. if you do not have Excel or some equivalent, you can download a free app at http://www.openoffice.org

    This new version of the tool has some updates and new features:
    • Fixed some minor calculation issues
    • Made minor formatting changes
    • Added valley support. You can now specify how many of each level and type of valley you control for a given city. The system will auto calculate the net bonus you will receive from your valleys and factor this into the calculations.
    • Added the stockpile skill to the input variables list.
    • Updated the capacity values and added a "Total Capacity" value.


    Final calculations have been tested to level 10 buildings. Level 8+ building calculations have a variance of 1-3 seconds from the actual but this is a nominal variation.

    If you populate this sheet with all the values for a given city you will get your total city output.

    NOTE: I have locked formula cells so only input cells can be edited. This is to prevent calculations from being thrown off.

    Thanks to everyone who contributed data!
    Necranom

    Attached Files Attached Files
    Last edited by Necranom; 04-12-2010 at 08:59 PM. Reason: Added Partial Screenshot
    I'm not paranoid...I'm just wrong a lot!

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •